State wants answers before Bertha resumes digging

The Seattle Times » The Seattle Tunnel Partners (STP), the contractor [...]

By |2018-02-05T14:32:48-08:00January 28, 2016|Alaskan Way Viaduct, Design-Build, Roads, Washington|Comments Off on State wants answers before Bertha resumes digging

Contractors challenge Governor’s order to halt Bertha after sinkhole

The Seattle Times » Seattle Tunnel Partners (STP) disagrees with the [...]

By |2018-02-05T16:01:16-08:00January 25, 2016|Alaskan Way Viaduct, Design-Build, Roads, Washington|Comments Off on Contractors challenge Governor’s order to halt Bertha after sinkhole

Bullet train’s first segment could open in the Bay Area instead of Southern California

Los Angeles Times » The California High Speed Rail Authority (HSRA) [...]

By |2018-03-07T13:36:03-08:00January 23, 2016|California, California High Speed Rail, Design-Build, Rail|Comments Off on Bullet train’s first segment could open in the Bay Area instead of Southern California

Washington Governor suspends Bertha tunneling after sinkhole

King 5 News » A sinkhole developed near the repair pit [...]

By |2018-02-05T16:01:51-08:00January 14, 2016|Alaskan Way Viaduct, Design-Build, Roads, Washington|Comments Off on Washington Governor suspends Bertha tunneling after sinkhole

After 2-year breakdown, Bertha begins tunneling again

Associated Press / KomoNews.com » After being stuck for two years, [...]

By |2018-02-05T16:44:45-08:00January 7, 2016|Alaskan Way Viaduct, Design-Build, Roads, Washington|Comments Off on After 2-year breakdown, Bertha begins tunneling again

Spanish team poised to win new high-speed rail contract

The Fresno Bee » The California High Speed Rail Authority (HSRA) [...]

By |2018-03-07T13:42:39-08:00January 5, 2016|California, California High Speed Rail, Design-Build, Rail|Comments Off on Spanish team poised to win new high-speed rail contract
Go to Top