The Capital Times » Under the bill, the DOT would be allowed to use alternative project delivery methods, specifically “Design-Build” or “Construction Manager-General Contractor” on highway projects. The only method currently allowed is design-bid-build, which critics say is not always the cheapest or most effective method to complete highway projects.