My Statesman » The Texas Department of Transportation has a contractor lined up to add a lane to each side of Texas 130 through Pflugerville, a popular commuter route that often backs up during rush hour. But the $36.7 million contract with OHL Construction is now caught up in the freeze on toll road projects. It is unclear when, or if, the project — along with a related lane addition on Texas 130 from U.S. 290 to Texas 71 and yet another project to build three more flyovers at U.S. 290 — will be revived.