Beaumont Enterprise » Houston-based Phillips 66 Co. says a new pipeline from West Texas to the Gulf Coast will cost $2 billion to build. In its second quarter 2018 earnings report Phillips 66 Co. said the system will have a capacity of 800,000 barrels of crude oil, connecting two oil fields with the Texas coast.